Replying to Shit for the lip
so everything on my setup is pretty much finished, i just have to add the lip. which would be sturdier in your opinion- plywood with a few logs below it or plywood on top of a mound of dirt? also, is a 4 foot drop in too much on top of a an 8 foot hill? the slope is about 25 degrees
Click to expand post