It looks like you are using an ad blocker. That's okay. Who doesn't? But without advertising revenue, we can't keep making this site awesome. Click the link below for instructions on disabling adblock.
I finally got around to welding my rails, I did 90% of the welding and cutting, and Scott and David painted 1 of them and welded one leg.
It's a 22ft flat rail with a little 2ft kink thing at the beginning and a 24 foot flat down flat rail. The Flat rail is 2.5 feet of the ground and the F-D-F rail is 3 feet at the top and 1 at the bottom with a 15 degree angle.