Newschoolers
Newschoolers
Twitter Facebook Fan
   
  1. Home
    • Hot (New!)
    • Latest (New!)
    • Top Rated (New!)
    • Video of the Day
    • Video of the Week
    • Video of the Month
  2. News
    • Features
    • Top Rated (New!)
    • Interviews
    • Events
    • Opinions
    • Industry News
    • Site
    • Product Info
    • Press Releases
  3. Forums
    • Site Discussion
    • Ski Gabber
    • Non-Ski Gabber
    • Media & Arts
    • Regionals
    • Cults
    • Gear Talk
    • Sell/Trade
    • WTB
  4. Pictures
    • Big Mountain
    • Halfpipe
    • Trending
    • Top Rated
    • Latest
    • Jumps
    • Rails
    • Sequences
    • Crash
    • Ski Equipment
  5. Videos
    • Summer
    • Jumps
    • Edits
    • Trending
    • Latest
    • Top Rated
    • Rails
    • Halfpipe
    • Big Mountain
    • Crash
    • Trailers
  6. Community
    • Reviews
    • Events
    • Polls
    • Games
    • Donate!
    • Top Rated Members
    • Cults
  7. NSTV
    • Chug Life
    • 4bi9
    • Traveling Circus
    • Salomon FSTV
    • The Weak
    • Westward
    • COC TV
    • K2 TV
    • 4FRNT TV
    • Inspired TV
  8. Contests
  9. Gear
    • Sell and Trade
    • Gear Talk
    • Reviews
    • Subscribe to Powder
  10. Store
Home News Forums Pictures Videos
Login to NS   |   Lost your password?   |   Register for NS
Lost your password? | Register for NS

Whistler Blackcomb Announces $18 Million Expansion for 2013/2014

Views: 1801
Comments: 0
Whistler Blackcomb Announces $18 Million Expansion for 2013/2014 Jan 19th 2013
By: WBUltimate Bling!
 
Font Size: A A A
Whistler Blackcomb has unveiled capital plans for a major lift expansion. Whistler Mountain’s Harmony high-speed, quad chairlift will be replaced with a new Doppelmayr high-speed, detachable, six-pack chairlift capable of transporting six people on each chair. Blackcomb Mountain will see a lift enhancement with a high-speed quad chairlift going into a new area in the Crystal Zone, currently accessed by a fixed-grip triple chair.

“This lift expansion clearly demonstrates our commitment to continuously enhance the skiing and riding experience on both mountains,” says Dave Brownlie, President and Chief Executive Officer, Whistler Blackcomb. “Each zone the new lifts will service is unique and much-loved by Whistler locals and destination guests alike. The capital we are investing to enhance our already amazing experiences will make Whistler Blackcomb even better.”



The new high-speed quad chairlift in the Crystal Zone will be 1,708 metres (5,604ft) in length, with a vertical rise of 535 metres (1,755ft). Skier carrying capacity will increase by 65 per cent over the current lift to 2,400 skiers per hour. The new quad will deliver skiers and riders to the same location as the current triple chair next to the Crystal Hut. However, the aspect of the new lift line is dramatically different, and will originate 158 metres (518ft) lower than the old Crystal lift. The bottom elevation will be 1,292 metres (4,239ft) and the top elevation of the lift will be 1,827 metres (5,994ft).

This bottom terminal location along the Blackcomb Glacier Road ski-out eliminates the need to utilize the Excelerator Chair to access many Crystal Zone trails including Ridge Runner, Rock ‘N’ Roll, and gladed trails like Outer Limits. It will be even quicker to return to the Glacier Express chair to access Horstman Glacier, Blackcomb Glacier and Spanky’s. The increased length of the chair’s line will give skiers and riders the opportunity to lap the entire Crystal Zone – from undulating cruisers to gladed zones riddled with natural terrain features and snow-caked trees straight out of a Dr. Seuss book. The name of this exciting new quad chairlift will be determined through a competition to be announced by Whistler Blackcomb later this winter.



The Harmony Six high-speed chairlift will replace one of Whistler Blackcomb’s most popular lifts and will dramatically improve the uphill capacity by 50 per cent; going from 2,400 skiers per hour to 3,600. The Harmony Six will service terrain spanning from the edge of the Symphony Amphitheatre all the way over to Glacier Bowl, adjacent to the Peak Express. This area, known as the Harmony Zone, makes up over 485 hectares (1,200 acres) of Whistler Blackcomb’s 3,306 hectares (8,171 acres) of total terrain. With a wide variety of beginner to expert terrain options, the Harmony Six will ensure skiers and riders are able to spend more time on the mountain exploring the spectacular, powder-covered alpine that Whistler Blackcomb is celebrated for.

The Harmony Six has the same alignment as the current Harmony quad; spanning 1,729 metres (5,672ft) in length, with a vertical rise of 525 metres (1,722ft). The top elevation of the lift is 2,107 metres (6,912ft); the bottom elevation is 1,582 metres (5,190ft).

Construction on the lifts will begin this spring and will continue through the summer and fall with an expected opening at the beginning of the 2013.2014 winter season.

Related Articles

Whistler Blackcomb Announces Opening Date

Whistler Blackcomb Announces Opening Date

Oct 29th 2012

Following multiple snowfalls and over 20 million gallons of water turned into snow by their snowmaking crew, Whistler Blackcomb will open for the 2012-2013 season on November 22nd.

  1. Views: 3853
  2. Comments: 3
  3.  
     
ESPN Announces X Games Expansion

ESPN Announces X Games Expansion

May 1st 2012

ESPN announces three new locations for their Global X Games expansion in 2013.

  1. Views: 14351
  2. Comments: 30
  3.  
     
Winter Games NZ announces 2013 plans

Winter Games NZ announces 2013 plans

Dec 21st 2011

The Winter Games NZ announced its plans for the 2013 event that will see the Games increase its standing on the international winter sports circuit Related posts:X Games Announces Expansion! It's going to be a 6 location, global event -... Winter Dew Tour Announces 2011-12 Schedule One of the biggest tours in the winter calendar has... Winter X Games 14 Slopestyle The eight male riders to contest the skiing slopestyle finals... [IMG]http://media.newschoolers.com/uploads/images/17/00/39/90/10/399010.jpeg[/IMG]

  1. Views: 1661
  2. Comments: 0
  3.  
     
X Games Announces Expansion!

X Games Announces Expansion!

May 19th 2011

It's going to be a 6 location, global event - making the biggest, bigger!Related posts:Jon Olsson announces JOI schedule Every year has JOI scratched into the calendar and this...Voleurz announces “Outdoor Graduation” Voleurz is pleased to announce “Outdoor Graduation”- the full-length movie!...The Expansion: Vol. 4 You may remember I posted a little something about...[IMG]http://media.nscdn.com/uploads/images/17/00/03/87/52/38752.jpeg[/IMG]

  1. Views: 1460
  2. Comments: 0
  3.  
     
share this news
Tweet
 
 
Score: 2

Comments

  1. There are no comments on this topic.

Add Comment:

You may use these HTML tags: <b> <i> <u> <p> <ul> <li>

If tags are ill-formed they may be removed.

URLs are automatically made into links.

To display an image you must put the image location between [IMG]..[/IMG] tags.

News RSS

  • RSS for All News
  • RSS for Press Releases Press Releases
  • RSS for Event Coverage Event Coverage
  • RSS for Interviews/Profiles Interviews/Profiles
  • RSS for Opinions Opinions
  • RSS for Features Features
  • RSS for Product Info Product Info
  • RSS for Industry News Industry News
  • RSS for Site News Site News
  • RSS for X Games X Games

More News in

placeholder

GrindMedia MTNAdvisor Surfer Magazine Surfing Magazine Powder Magazine Snowboarder Magazine Skateboarder Magazine Canoe & Kayak Bike Magazine Standup Paddler Fantasy Surfer GrindTV Surf Ski Motocross Mountain Bike
Copyright © 2013 GrindMedia, LLC. All rights reserved.
(Version 4.0.12)
Rendered in 75.5ms
Home | Advertise | Register | Contact | Privacy Policy | Terms Of Use | Logout