It looks like you are using an ad blocker. That's okay. Who doesn't? But without advertising revenue, we can't keep making this site awesome. Click the link below for instructions on disabling adblock.
Welcome to the Newschoolers forums! You may read the forums as a guest, however you must be a registered member to post.
Register to become a member today!
Alright, so my rail has support beams that are 2 feet high, i made it in the summer, and realized its too big for summer setup, cause i need a huge fucking kicker. i have like 6 inch screws connecting the PVCplatform and the feet. so i dunno how i can cut it. any tips?
how are the feet connected on it. If you can take the feet off it and cut the supports down you could make it shorter that way. and if that doesnt work just dig a hole under the feet and burry them down a little.
jea, mine was about 6 feet tall and i put it about three feet into the ground with only four 2 inch diameter steel pipes over 25 feet of rail for support. now i have a permanant handrail. no cement either and its still sturdy